Refinery Product Wharf Upgrade, Port Dickson

  • Project Type
  • Petrochemical Terminal
  • Client
  • ESSO Malaysia Berhad
  • Project Value
  • Not Available
  • Project Period
  • 1992 - 1994
  • Current Status
  • Completed
  • Services
  • Detailed Design • Site Supervision

Description

The project included the extensive rehabilitation and upgrading of the client’s Port Dickson refinery product wharf including:

Strengthening the wharf structure by incorporating new reinforced concrete beams and steel piles.


The refinery remained operational during the project so disruptions to the product wharf operations and required down times had to be minimised.

The project was tendered on a lump-sum “design and construct” basis. A local contractor, in conjunction with Cullen Grummitt & Roe, successfully tendered for the work.  Cullen Grummitt & Roe provided structural and civil engineering input as follows: